Learning objectives
Study of this chapter will enable the reader to:
1. identify the actions necessary prior to commencement of a construction, in order to
facilitate the correct provision of utility services;
2. coordinate utility services under public footpaths;
3. design suitable routes for utility services;
4. calculate the areas of buildings needed for services plant;
5. find the sizes of plant room needed for all services from preliminary building
information at the design stage;
6. allocate routes for services through the building structure;
7. understand the need for fire barriers in service ducts and correctly locate them;
8. choose suitable sizes for pipe service ducts;
9. understand the need to allow space for pipes crossing over each other;
10. estimate sizes for service shafts carrying air ducts;
11. know the requirements for walkway arid crawl way ducts;
12. understand the need for expansion provision in pipework;
13. identify the ways in which pipes can be supported with allowance for thermal
movement;
14. understand the ways in which thermal movement is accommodated;
15. know how thermal, fire, support and vibration measures are applied to pipes air ducts
passing through fire barriers;
16. apply flexible connections to plant;
17. appreciate the need for coordinated drawings;
18. understand the use of services zones;
19. be able to design boiler house ventilation.